From: owner-ammf-digest@smoe.org (alt.music.moxy-fruvous digest) To: ammf-digest@smoe.org Subject: alt.music.moxy-fruvous digest V14 #3880 Reply-To: ammf@fruvous.com Sender: owner-ammf-digest@smoe.org Errors-To: owner-ammf-digest@smoe.org Precedence: bulk alt.music.moxy-fruvous digest Wednesday, April 1 2020 Volume 14 : Number 3880 Today's Subjects: ----------------- The Solution Is Simple! ["High BP Program" Subject: The Solution Is Simple! The Solution Is Simple! http://lifeprogram.guru/dE6CC28dv3jVC2zy0PiQBWu2FE2zHLuKDqZ1XNHN6IM4lZ81 http://lifeprogram.guru/RDhee7d9u_3oWLcHV2UkxrUI37NtM3UPenD-K5i0Ptvz5CzV In July 2008, the Survivors' Staircase was lowered to bedrock, making it the first artifact to be moved into the museum. By the end of August, the footings and foundations were completed. On September 2 construction workers raised the 7,700-pound (3,500 kg) first column for the memorial, near the footprint of the North Tower. By then, about 70 percent of the construction contracts were awarded or ready to award. A total of 9,100 short tons (8,300 t) of steel were installed at the memorial site. By April 2010 the reflecting pools were fully framed in steel, and 85 percent of the concrete had been poured. By April 22, workers had begun installation of the granite coating for the reflecting pools. By June the North Pool's granite coating was completed, and workers had begun granite installation in the South Pool. In July, the first soil shipments arrived at the site, and in August workers began planting trees on the memorial plaza. The swamp white oaks can reach 60 to 80 feet (18 to 24 m) at maturity, live from 300 to 350 years, and their autumn leaves are gold-colored. The "Survivor Tree" is a callery pear which survived the devastation and was kept for replanting. In September, workers reinstalled two tridents salvaged from the Twin Towers. In November 2010, workers began testing the North Pool waterfall. Construction progressed through early 2011: installation of glass panels on the museum pavilion's facade began in March, and workers began testing the South Pool waterfall two months later. Most of the memorial was finished in time for the 10th anniversary of the terrorist attacks, with the museum planned for completion the following year. By September 2, 243 trees were planted at the site and eight more were planted in the days before the memorial opened. By then, both pools were completed and the waterfalls were tested daily. ------------------------------ End of alt.music.moxy-fruvous digest V14 #3880 **********************************************